
Add to Cart
SPECIFICATIONS FOR R52 pressure regulator |
Max. inlet pressure | 500, 1500, 3000psig | ||
outlet pressure | 0-15,0-25,0-50,0-100,0-250psig | ||
safety testing pressure | 1.5times max. inlet pressure | ||
applicable temperature | -10 ℉+165℉ (-23℃+74℃) | ||
leakage rate | foam test | ||
Cv | 0.06 |
Main parts of material | |||
body | 316L | ||
bonnet | 316L | ||
seat | PCTFE | ||
spring | 316L | ||
stem | 316L | ||
o-ring | viton | ||
stainer | 316L(10um) |
1) piston reducing pressure structure.
2) body ports:1/4NPT (F)
3) set stainer inside.
4) using panel mouting or wall mounting
Ordering Information
R52 | L | B | D | G | G | 00 | 00 | P |
ltem | Body Material | Body Hole | Inlet Pressure | Outlet pressure | Pressure gauge | Inlet size | Outlet size | Options |
R52 | L:316 | A | D:3000psig | G:0~250psig | G:MPa gauge | 00:1/4"NPT(F) | 00:1/4"NPT(F) | P:Panel mounting |
B:Brass | B | E:1500psig | 1:0~100psig | P:Psig/bar gauge | 01:1/4"NPT(M) | 01:1/4"NPT(M) | R:With relief valve | |
D | F:500psig | K:0~50psig | W:No gauge | 23:CGA330 | 10:1/8"OD | N:With needle valve | ||
G | L:0~25psig | 24:CGA350 | 11:1/4" OD | D:With diaphragm valve | ||||
J | M:0~15psig | 27:CGA580 | 12:3/8" OD | |||||
M | Q:30" Hg Vac-30psig | 28:CGA660 | 15:6mm OD | |||||
S:30" Hg Vac-60psig | 30:CGA590 | 16:8mm OD | ||||||
T:30" Hg Vac-100psig | 52:G5/8M-RH(F) | 74:M8B1-RH(M) | ||||||
U:30" Hg Vac-200psig | 63:W21 8-14RH(F) | |||||||
64:W21 8-14LH(F) |
Application field laboratory, etc
FAQ
Q1. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order quantity more than
Q2. Do you have any MOQ limit ?
A: Low MOQ 1 pic.
Q3. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days. Airline and sea shipping also optional.
Q4. How to proceed an order ?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.